The side glass panes are attached by means of stainless steel tension fasteners in the upper area and by support in the lower area. This solution ensures maximum transparency. The direct location on the river is a logistical challenge. The pre-installed, approx. 9t heavy glass bridge has to be lifted from the street side over the existing building to the installation point on the fourth floor.
This project enables seele to finally realise a building project in Austria - and then such a spectacular one.
Header image: © Bründl Sports / Joachim Grothus